One lane of Pacific Coast Highway was closed in each direction overnight on September 6. The overnight closures will continue nightly from 9 p.m. to 5 a.m. Monday, September 9, through Friday, September 13.
One lane each way will be closed between Temescal Canyon Road and Porta Marino. The closure is necessary to repave two sections of the highway north of Temescal. Lanes will reopen each morning.
During the construction period, the speed limit along the affected portion of PCH will be temporarily lowered from 45 mph to 35 mph.
Drivers are advised to plan for delays and consider alternate routes during the repaving project.
CalTrans Public Information Officer Marc Bishoff reminds motorists “Please drive safely through work zone areas.”